How to Prepare Your EOS® V/TO® in Ninety for Planning Sessions
To prepare your Vision/Traction Organizer® (V/TO) in Ninety for a planning session, confirm who can edit it, make sure the Measurables on it have goals and actuals entered, and let Ninety archive the current version when the session starts. Your team then revises the plan inside the same agenda it uses to set next quarter's Rocks.
Planning sessions start badly when the team opens the plan and finds last year's numbers, a section someone changed without telling anyone, or two copies that don't match. Ninety is the AI-powered business operating system for companies running on EOS®, licensed by EOS Worldwide. It holds your V/TO and builds it into the planning agendas in its Meetings tool.
How Do Edit Permissions Work for the V/TO?
Before the session, have the person entering changes open the team’s V/TO and confirm they can edit the sections you’ll update.
Each team's V/TO opens from the Team dropdown, so confirm you're on the leadership team's version before anyone starts typing.
Which Numbers Should Be Current Before the Session?
In your Quarterly and Annual Scorecards, check that the Measurables tracked on your V/TO have both goals and actual results entered. The team then reviews real numbers against the plan instead of blank fields.
The Traction page also shows your Long-Term Issues next to the 1-Year Plan and 90-Day World®. Reviewing that list in Ninety ahead of time tells you which items are still open before the team sits down.
What Happens to the Current V/TO When the Session Starts?
Ninety automatically archives a copy of your team's V/TO when you start an Annual Session or run a quarterly meeting. Archived copies keep the text, Issues, Rocks, and goals from that version, and you can open them anytime under View Archived Visions.
You can also click Archive to save a copy yourself before a large edit. For example, the team can pull up last year's 3-Year Picture™ beside the draft it's revising, without hunting through email for an old file.
Where Does the V/TO Appear in the Annual Session Agenda?
Start the session from Meetings, choose the team, and select Annual Session. In Ninety’s default Annual Session agenda for leadership teams, Day 1 includes V/TO Review and 3-Year Picture sections, and the Day 2 agenda includes 1-Year Plan and Rocks sections. When you click Finish Day 1, the Day 2 agenda appears in the team's Meetings tool.
Because the V/TO and the agenda share one platform, when you edit the V/TO during the session, those edits update the live plan . Rocks set on Day 2 can be linked to 1-Year goals on the Planning Board, and SWOT items can go straight to the Issues list with Make It an Issue.
Start Your Next Planning Session From the Current V/TO
Before your next Annual Session, check edit access and the Measurables on your V/TO in Ninety, then let the session archive the version you're replacing. Start a free trial and walk into planning with one current plan.
FAQ
Does every team in Ninety get a V/TO page?
Yes. Every team in Ninety has its own customizable V/TO page, except teams set up as Project Teams. Switch between them with the Team dropdown.
Can we add sections the standard V/TO doesn't include?
Yes, with Custom Vision turned on. Only leadership team owners, admins, or coaches can enable Custom Vision, and it applies company-wide. Then add a section through Manage Sections. Default sections can't be deleted.
Why does text I enter in the 1-Year Plan also appear in the 3-Year Picture and 90-Day World?
Those three sections share one description field in Ninety, so text entered in one appears in all three. Use each section's own fields for content that belongs to only one time frame.
Does Ninety's free plan include the SWOT page?
No. Free plans include the Vision and Traction pages. The SWOT page is available on paid plans.